Coffer runs the material side of estimating and project controls for heavy-civil contractors, from the first vendor quote to the last vendor invoice.
Book a demo- Cedar Ridge SupplyINV-88907PO 26210-001 · $32,002.76Held
- Summit WaterworksINV-4471PO 26210-002 · $58,191.43Matches
- Core & MainY421877PO 26210-003 · $12,880.15Matches
- FergusonINV-90112$3,420.00No PO
- FortilineINV-5521PO 26210-004 · $6,214.90waiting
| Line | PO | Quote | Invoice | Check |
|---|---|---|---|---|
| 8-IN DIP CL52 | 120 × 41.16 | 41.16 | 120 × 41.16 | Matches |
| 8-IN MJ GATE VALVE | 4 × 979.90 | 979.90 | 4 × 1,052.00 | Above PO price |
| 8-IN MJ 90° BEND | 6 × 321.21 | 321.21 | 6 × 321.21 | Matches |
| 8-IN MJ TEE | 2 × 630.63 | 630.63 | 2 × 630.63 | Matches |
| FIRE HYDRANT ASSEMBLY | 3 × 3,168.00 | 3,168.00 | 4 × 3,168.00 | Quantity over estimate |
| RESTRAINED JOINT GLAND | 18 × 146.42 | 146.42 | 18 × 146.42 | Matches |
| MJ ACCESSORY KIT | 12 × 177.66 | 177.66 | 12 × 177.66 | Matches |
| 12 AWG TRACER WIRE | 850 × 0.54 | 0.54 | 850 × 0.54 | Matches |
| UG WARNING TAPE | 850 × 0.32 | 0.32 | 850 × 0.32 | Matches |
| VALVE BOX ADJ | 4 × 214.14 | 214.14 | 4 × 214.14 | Matches |
| FREIGHT | 640.00 | Not on the PO | ||
| Total | 27,906.36 | 32,002.76 |
Every firm is different. So we learn yours first.
Coffer is custom. It already knows the trade: vendor quotes, units, freight and resource codes. Then we build it around your people, your process and your rules. A tool that doesn’t know them goes unused.
One vendor quote. Three firms.
What your firm gets once Coffer is deployed.
| WP-1001 | 8-IN DUCTILE IRON PIPE CL52 | 120 LF | 41.16 |
| WP-1002 | 8-IN MJ GATE VALVE | 4 EA | 979.90 |
| WP-1003 | 8-IN MJ 90° BEND | 6 EA | 321.21 |
| WP-1004 | 8-IN MJ TEE | 2 EA | 630.63 |
| WP-1005 | FIRE HYDRANT ASSEMBLY | 3 EA | |
| WP-1006 | RESTRAINED JOINT GLAND | 18 EA | |
| WP-1007 | MJ ACCESSORY KIT | 12 EA | |
| WP-1008 | 12 AWG TRACER WIRE | 850 LF | |
| WP-1009 | UG WARNING TAPE | 850 LF | |
| WP-1010 | VALVE BOX ADJ | 4 EA |
| WP-1001 | 8-IN DUCTILE IRON PIPE CL52 | 120 LF | 41.16 | ready |
| WP-1002 | 8-IN MJ GATE VALVE | 4 EA | 979.90 | ready |
| WP-1003 | 8-IN MJ 90° BEND | 6 EA | 321.21 | to check |
| WP-1004 | 8-IN MJ TEE | 2 EA | 630.63 | ready |
| WP-1005 | FIRE HYDRANT ASSEMBLY | 3 EA | 3,168.00 | ready |
| WP-1006 | RESTRAINED JOINT GLAND | 18 EA | 146.42 | ready |
| WP-1007 | MJ ACCESSORY KIT | 12 EA | 177.66 | to check |
| WP-1008 | 12 AWG TRACER WIRE | 850 LF | 0.54 | ready |
| WP-1009 | UG WARNING TAPE | 850 LF | 0.32 | to check |
| WP-1010 | VALVE BOX ADJ | 4 EA | 214.14 | ready |
What did we bid 8-in DIP water main at on past jobs?
Five past bids, per LF installed:
Median: $101.75 per LF
- Material listYour Excel8-IN DIP CL52WP-1001 · 120 LF8-IN MJ GATE VALVEWP-1002 · 4 EA8-IN MJ 90° BENDWP-1003 · 6 EA
- RFQSent from your Outlook8-IN DIP CL52Line 1 · 120 LF8-IN MJ GATE VALVELine 2 · 4 EA8-IN MJ 90° BENDLine 3 · 6 EA
- Cedar Ridge quoteCRS-104828 DIP CL52 MJ120 LF · 41.168 MJ RW GV OL4 EA · 979.908 MJ 90 BEND6 EA · 321.21
- Purchase order26210-001 · to CMiC8-IN DIP CL52120 LF · $4,939.208-IN MJ GATE VALVE4 EA · $3,919.608-IN MJ 90° BEND6 EA · $1,927.26
- 8-IN DIP CL52WP-10011,425 of 1,200 LFOver estimate
- 8-IN MJ GATE VALVEWP-100212 of 12 EAAbove PO price
- 8-IN MJ 90° BENDWP-100318 of 18 EA
- 8-IN MJ TEEWP-10046 of 6 EA
- FIRE HYDRANT ASSEMBLYWP-100510 of 9 EAOver estimate
- RESTRAINED JOINT GLANDWP-100654 of 60 EA
- MJ ACCESSORY KITWP-100736 of 36 EA
- 12 AWG TRACER WIREWP-10082,400 of 2,550 LF
- UG WARNING TAPEWP-10092,400 of 2,550 LF
What John Burns Construction saw in its first three weeks.
8 quotes onto the bid sheet
7× faster
The first purchase order
4× faster
Lines retyped on one bid

That’s exactly what we need. Ah man, that’s so easy.
How it works
Book a demo01Discover
We find the work worth handing to Coffer.
We look at how your team does it today, on your own bids.
02Deploy
We build Coffer around your firm.
Your records connected, your rules written down, and the work set up the way your team does it.
03Evolve
Coffer gets better as your team works.
Your team makes the calls. Each correction is kept, so the next bid needs less of their time.
- HeavyBid
- CMiC

- Excel
- Outlook
- SharePoint
- Your own Claude or ChatGPT
- Coffer in the browser
- Where you message
Built for contractors who buy their own materials.
Self-perform heavy-civil and utility contractors that price material from vendor quotes. If your team retypes quotes into Excel or HeavyBid today, Coffer is built for you.
Heavy-civil and utility work
Material-heavy jobs where the price of pipe, valves and fittings decides the bid.
Water · Sewer · Storm · Site work · Underground · Electrical utility
From $20M to $1B a year
A firm that prices in Excel, or one with a codebook in HeavyBid.
$20M$1BWhere the work lives in Excel and email
Coffer takes over the retyping between the quote, the sheet and the PO.
For the whole material team
One set of data from the estimate to the invoice.
- Estimators
- quotes, leveling, the carry
- Procurement
- RFQs and POs
- Project managers
- invoices and job cost
Yours to keep
Your data and what Coffer learns about your firm stay yours. Export them whenever you need.
- Ferguson
- 412 matches
- Core & Main
- 368 matches
- Cedar Ridge Supply
- 97 matches
Run with you, not handed off
We run the setup and keep it working as your process changes.
- Tue
- A weekly session
- Same day
- A fix the day you ask
See it on your own bids.
Talk with our team. We learn how your firm works today, then show you the work Coffer would take on and what would change for your estimators.
Declan KramperOwner